Volume of Dilution Water or Mud Required to Maintain Circulating Volume
Volume of Dilution Water or Mud Required to Maintain Circulating Volume Formula |
||
\( V_{wm} \;=\; \dfrac{ V_m \cdot ( F_l - F_o ) }{ F_l \cdot F_a }\) | ||
Symbol | English | Metric |
\( V_{wm} \) = Volume of Dilution Water or Mud Required to Maintain Circulating Volume | \(bbl\) | - |
\( V_m \) = Volume of Mud in Circulating System | \(bbl\) | - |
\( F_l \) = Low Gravity Solids in System (%) | \(dimensionless\) | - |
\( F_o \) = Optimum Low Gravity Solids Desired (%) | \(dimensionless\) | |
\( F_a \) = Low Gravity Solids Added (%) | \(dimensionless\) |
To maintain a constant circulating volume of drilling mud, the volume of dilution water or base fluid required must precisely offset any increases in volume caused by drilled solids entering the system. As the drill bit penetrates formations, cuttings are generated and carried to the surface by the drilling fluid, thus increasing the total volume of the circulating mud.
To counteract this, a calculated amount of dilution water or the base oil of the mud (in the case of oil-based muds) is continuously or intermittently added to the active mud system. The specific volume of dilution fluid needed depends on several factors, including the rate of penetration, the size of the drilled cuttings, the efficiency of the solids control equipment in removing these cuttings, and the desired level of solids concentration in the mud. The goal is to remove as much of the drilled solids as practically possible with mechanical separation equipment and then dilute the remaining solids to an acceptable concentration to maintain optimal mud properties and a consistent circulating volume for efficient drilling operations.