Skip to main content

The placement of a lockout device on an energy isolating device in accordance with an established procedure, ensuring that the energy isolating device and the equipment being controlled cannot be operated until the lockout device is removed.

Piping Designer Logo 1

Random Articles

Ideal Gas Law Volume
Angular Acceleration
Transitive Property
Back Pressure Valve
Spring Load