Run Time

Written by Jerry Ratzlaff on . Posted in Manufacturing Engineering

Run time, abbreviated as RT, is the scheduled production time and its running.

 

Run Time Formula

\(\large{ RT = \frac{ PPT }{ ST }  }\)   

Where:

\(\large{ RT }\) = run time

\(\large{ PPT }\) = planning production time

\(\large{ ST }\) = stop time (manufactures process time, but with no planned or unplanned stops)

 

Tags: Equations for Manufacturing