Total Material Costs

on . Posted in Project Management Engineering

Total material costs, abbreviated as TMC, is all the manufacturing raw or direct material costs for a given product or a certain service.

 

Total material costs Formula

\(\large{ TMC = BM + MP - EM  }\) 
Symbol
\(\large{ TMC }\) = total material costs
\(\large{ BM }\) = beginning materials
\(\large{ EM }\) = ending materials
\(\large{ MP }\) = materials purchased

 

Piping Designer Logo 1