Improvement Rate

on . Posted in Project Management Engineering

Improvement rate, abbreviated as IR, is the percentage of increase from one number to another.

 

Improvement Rate Formula

\(\large{ FR =  \frac{ SMT \;-\; FMT }{ FMT } \; 100  }\)
Symbol
\(\large{ FR }\) = improvement rate
\(\large{ FMT }\) = first month's total
\(\large{ SMT }\) = second month's total

 

Piping Designer Logo 1