Skip to main content

Amount of Mud Required to Displace Cement in Drill Pipe

 

Amount of Mud Required to Displace Cement in Drill Pipe Formula

\( M \;=\; DP_l \cdot DP_c  \)     (Amount of Mud Required to Displace Cement in Drill Pipe)

\( DP_l \;=\; \dfrac{ M }{ DP_c  }\)

\( DP_c \;=\; \dfrac{ M }{ DP_l  }\)

Symbol English Metric
\( M \) = Amount of Mud Required \(bbl\) -
\( DP_l \) = Drill Pipe Length \(ft\) -
\( DP_c \) = Drill Pipe Capacity \(bbl\;/\;ft\) -

 The amount of mud required to displace cement in a drill pipe depends on the internal volume of the drill pipe and the length of the pipe to be displaced.

Piping Designer Logo 1