Skip to main content

 

Run Time Formula

\( RT \;=\; \dfrac{ PPT }{ ST } \) 
Symbol
\( RT \) = run time
\( PPT \) = planning production time
\( ST \) = stop time (manufactures process time, but with no planned or unplanned stops)

Run time, abbreviated as RT, is the scheduled production time and its running. 

Piping Designer Logo 1