Skip to main content

 

 

Predetermined Overhead Rate Formula

\( POHR \;=\;  \dfrac{ MOHR }{ ABP }  \) 
Symbol
\( POHR \) = predetermined overhead rate
\( MOHR \) = estimated manufacturing overhead rate
\( ABP \) = estimated units of the allocation base for the period

Predetermined overhead rate, abbreviated as POHR, is the allocation rate that is assigned to products or job orders at the beginning of a project. 

Piping Designer Logo 1