Maximum Drilling Rate

on . Posted in Drilling Engineering

    

 Maximum Drilling Rate - Large hole formula

\( MDR \;=\;   67 \; ( MW_o - MW_i )  \; C_r  \;/\; D_h^2  \)
Symbol English Metric
\( MDR \) = maximum drilling rate \(ft\;/\;hr \) -
\( MW_o \) = mud weight out (ppg) \(lbm \;/\; gal\) -
\( MW_i \) = mud weight in (ppg) \(lbm \;/\; gal\) -
\( C_r \) = circulation rate (gpm) \(gal \;/\; min\) -
\( D_h \) = drill hole size \(in\) -

 

Piping Designer Logo 1

Tags: Drilling