Amount of Additive Required to Achieve a Required Cement Slurry Density

on . Posted in Drilling Engineering

             

Amount of Additive Required to Achieve a Required Cement Slurry Density formula

\( x \;=\;  \dfrac{  \left( \dfrac{ \rho \cdot 11.207983 }{ SG_c } \right) + ( \rho \cdot C) - 94 - ( 8.33 \cdot C )  }{  \left( 1 + \dfrac{ A }{ 100 } \right) -  \left( \dfrac{ \rho }{ 8.33 \cdot SG_a } \right)  - \left( \rho + \dfrac{ A }{ 100 } \right) }\)    
Symbol English Metric
\( x \) = Amount of Additive Required \(lbm \;/\; stroke\) -
\( \rho \) = Required Slurry Density \(lbm \;/\; gal\) -
\( SG_c \) = Cement Specific Gravity \(dimensionless\) -
\( C \) = Cement Water Requirement \(gal \;/\; stroke\) -
\( A \) = Additive Water Requirement \(gal \;/\; stroke\) -
\( SG_a \) = Additive Specific Gravity \(dimensionless\) -

 

Piping Designer Logo 1

Tags: Drilling Drilling Mud